New Coffee Shop Planned for This Dallas Location

A new Dutch Bros Coffee location is planned for Singleton Boulevard in Dallas, according to a filing with the Texas Department of Licensing and Regulation. The project calls for a small freestanding coffee stand with drive-thru service, continuing the brand’s expansion across North Texas.

Advertisement

Construction Details

The filing lists the project as new construction for a 986-square-foot Dutch Bros Coffee building. The design includes both drive-thru and walk-up ordering areas, which is typical for the company’s compact, high-throughput locations.

Construction is scheduled to begin in September 2026, with an estimated completion date in January 2027. The project is privately funded and includes on-site improvements as part of the overall scope.

Advertisement

Site History and Timeline

The project site has undergone a clear transformation over time. Historical imagery shows that the property previously operated as a Minyard Food Store gas station, complete with a fuel canopy, pump islands, and a small retail structure.

Street-level imagery from April 2019 still shows the gas station intact. By November 2020, aerial imagery confirms that the fuel canopy and pump infrastructure had been removed, marking a partial demolition of the site. At least one structure remained standing at that time, while much of the former gas station area had been cleared and repaved.

Advertisement

This places the primary demolition activity between 2019 and 2020, transitioning the site away from its former use.


Location Context

The site sits along Singleton Boulevard in West Dallas, a heavily trafficked corridor lined with a mix of retail and quick-service restaurants. The property is positioned next to a KFC, reinforcing the area’s auto-oriented commercial layout.

Advertisement

The planned Dutch Bros location aligns with this environment, as the brand typically targets high-visibility sites with strong vehicle access for its drive-thru-focused model.


What to Watch

As of the latest confirmed imagery, the site had already been partially cleared, but no vertical construction related to Dutch Bros has been observed. With construction not scheduled to begin until late 2026, the property may remain in its current state until development activity ramps up.

Advertisement

Last Updated on April 28, 2026 by F.E.M

Get the scoop on the latest developments and attractions – subscribe today!